• Home
  • About Us
  • Schedule
  • News
    • Citi Sports
    • Citi Business
  • Citi TV
  • Audio On Demand
  • Events
Citi 97.3 FM - Relevant Radio. Always
No Result
View All Result
Citi 97.3 FM - Relevant Radio. Always
  • Home
  • About Us
  • Schedule
  • News
    • Citi Sports
    • Citi Business
  • Citi TV
  • Audio On Demand
  • Events
Citi 97.3 FM - Relevant Radio. Always

Mahama should be careful about his promise to fix ‘Dumsor’ – KT Hammond

February 27, 2015
Reading Time: 3 mins read
Oteng-Adjei is hiding one more state vehicle –  KT Hammond

KT Hammond

Share on FacebookShare on TwitterShare on Whatsapp

The Minority Spokesperson on Energy, KT Hammond has watered down President John Mahama’s seemingly firm pledge to fix the power crisis.

[contextly_sidebar id=”c9e0UGiwUge2HtgzTwSUGjhPQdvZRFM8″]The Minority led by KT Hammond have consistently expressed doubts over government’s promises to end the power crisis in the shortest possible time.

President Mahama during  the State of the Nations Address in Parliament on Thursday, stated clearly that, “I do not intend to manage the situation. I intend to fix it. I John Dramani Mahama will fix the energy situation.”

He highlighted a number of measures government is implementing to end the power crisis.

According to him,  Independent Power Producers (IPPs) that have been brought on board to ease the power situation could “inject 3,665 MW of power into our power transmission grid,” in the next five years.

Some of the IPPs he said include Sunon Asogli (Phase II, 360MW), Sunon Asogli (Coal fired – 750MW), CenPower (350MW), Jacobsen (360MW),  Amandi (240MW), GE (1000MW), VRA (T4, 185MW) and VRA (KTPP, 220MW).

Speaking on Eyewitness News however, KT Hammond insisted that President Mahama should not have included coal fired alternative in his address saying “I’m not so sure we have much of coal discovery in Ghana so that is the other problem. I’m not sure where the coal is going to come from.”

“Cenpower, has it started or not? What about Jacobsen and Amandi? We signed those power purchase agreement only two weeks ago in Parliament,  and then General Electric, 1000 megawatts. Well, the president should be careful of the figures he is telling us,” he added.

Ghana has been battling with inconsistent power supply  over the past few years.

This situation has compelled the Electricity Company of Ghana (ECG) to shed load in the country.

The opposition New Patriotic Party, NPP managed to mobilize several thousands of its supporters and Ghanaians onto the streets recently to protest against government’s handling of the current energy crisis and economic difficulties.

A similar event was held in Kumasi on Wednesday which also attracted thousands of people in the Ashanti Region.

–

By: Godwin Allotey Akweiteh/citifmonline.com/Ghana

Follow @AlloteyGodwin

Tags: Foresight Medical CenterPalaver Newspaper
Previous Post

[Audio] US$940m IMF deal ‘positive but unspectacular’ – Bernard Avle

Next Post

Ghanaian employee at British Commission dismissed over visa fraud

  • About Citi FM
  • Archives
  • Audio on Demand
  • CITI OPPORTUNITY PROJECT ON EDUCATION (COPE)
  • Events
  • Heritage Caravan: Registration Form
  • Home
  • Schedule
Call us: +233 30 222 6013

© 2024 Citi 97.3 FM - Relevant Radio. Always

No Result
View All Result
  • Home
  • About Us
  • Schedule
  • News
    • Citi Sports
    • Citi Business
  • Citi TV
  • Audio On Demand
  • Events

© 2024 Citi 97.3 FM - Relevant Radio. Always