• Home
  • About Us
  • Schedule
  • News
    • Citi Sports
    • Citi Business
  • Citi TV
  • Audio On Demand
  • Events
Citi 97.3 FM - Relevant Radio. Always
No Result
View All Result
Citi 97.3 FM - Relevant Radio. Always
  • Home
  • About Us
  • Schedule
  • News
    • Citi Sports
    • Citi Business
  • Citi TV
  • Audio On Demand
  • Events
Citi 97.3 FM - Relevant Radio. Always

Tullow to complete maintenance works on FPSO Kwame Nkrumah tomorrow

April 4, 2016
Reading Time: 1 min read
Share on FacebookShare on TwitterShare on Whatsapp

Tullow Ghana has announced that it will complete the planned maintenance works of the FPSO Kwame Nkrumah by tomorrow, 5 April.

According to the company, oil production and gas export from the Jubilee field will commence on April 9.

This will allow for final preparation of new off-take arrangements which involve the use of a dynamically-positioned shuttle tanker and a storage tanker.

The FPSO Kwame Nkrumah was shut down about two weeks ago to undergo mandatory inspection and maintenance works.

At the time, GRIDCo assured that the Volta River Authority (VRA), has purchased enough light crude oil to power some of the thermal plants within the Aboadze power enclave in the Western Region to avert a load shedding.

The Volta River Authority (VRA), also  revealed that it had negotiated with Ivorian power producers for a possible supply of power.

–

By: Lawrence Segebfia/citibusinessnews.com/Ghana

 

Previous Post

Kotoko sacks Coach Duncan after poor results

Next Post

VRA holds open forum at Ekumfi for Ghana’s 1st coal power plant

  • About Citi FM
  • Archives
  • Audio on Demand
  • CITI OPPORTUNITY PROJECT ON EDUCATION (COPE)
  • Events
  • Heritage Caravan: Registration Form
  • Home
  • Schedule
Call us: +233 30 222 6013

© 2024 Citi 97.3 FM - Relevant Radio. Always

No Result
View All Result
  • Home
  • About Us
  • Schedule
  • News
    • Citi Sports
    • Citi Business
  • Citi TV
  • Audio On Demand
  • Events

© 2024 Citi 97.3 FM - Relevant Radio. Always