• Home
  • About Us
  • Schedule
  • News
    • Citi Sports
    • Citi Business
  • Citi TV
  • Audio On Demand
  • Events
Citi 97.3 FM - Relevant Radio. Always
No Result
View All Result
Citi 97.3 FM - Relevant Radio. Always
  • Home
  • About Us
  • Schedule
  • News
    • Citi Sports
    • Citi Business
  • Citi TV
  • Audio On Demand
  • Events
Citi 97.3 FM - Relevant Radio. Always

Western railway lines to cost $1 billion

July 14, 2015
Reading Time: 2 mins read
Gov’t begins negotiations with railway workers

File photo

Share on FacebookShare on TwitterShare on Whatsapp

The Minister of Transport, Mrs Dzifa Attivor, has disclosed that re-development works on the Western Railway Line, which would stretch from Takoradi to Kumasi; including a branch line from Dunkwa to Awaso is estimated to cost $1 billion.

The project which is to ensure the modernization of the Western Railway Line, will include modern rail stations, terminals and ancillary facilities and also safe, smooth and timely services.

Mrs Attivor said this on Monday during a forum to discuss the Front End Engineering Design (FEED) report on the Western Railway Line.

[contextly_sidebar id=”8XHbXbXz8M6vHvxUrYVUIBuazjLTPxul”]The FEED report details the look of the Western Railway Lines, the various aspects of the project, and the estimated cost.

The design also involved the renovation and remodeling of 38 stations, including two terminals with all facilities, retrofitting and reconstruction of more than 200 bridges and culverts, and the provision of a more realistic estimation of the cost of construction.

The rest are the provision of the state of the art signalling and telecommunication system, reconstruction and remodeling of workshops and running sheds among others.

Mrs Attivor said the preliminary designs of the projects will provide a platform for a transparent and a more realistic engagement with private sector investors on a project, which would be handled under the auspices of the Ghana Railway Development Authority (GRDA).

The FEED project or the design for the Western Line by the GRDA was done by Messrs Team Engineering SpA of Italy, a consultancy with full funding by the Government.

She urged GRDA to sensitise the public on the design principles and parameters for the new railway system, which would be implemented in accordance with the Railway Master Plan for Ghana.

Mrs Attivor cited encroachment on railway lands, and the destruction of railway lands by illegal miners as some of the major challenges facing the rail way system.

“Also, illegal leasing of lands by the Ghana Railway Company, thereby creating litigation on some of these lands needed for development, is also a matter of concern”, she said.

She promised that the Ministry will do all it could to protect these lands for the development of the railways sector, adding that concerns, which would be raised at the end of the forum would be used to assist the consultants in proceeding with the finalization of the preliminary design which will guide the country’s efforts to develop the railway network, whiles optimizing construction cost.

 

Source: GNA

 

Tags: Dr. Kwesi AnninSt Augustine's College
Previous Post

Review fuel prices everyday – ACEP

Next Post

Stop settling criminal matters – Chief Justice to chiefs

  • About Citi FM
  • Archives
  • Audio on Demand
  • CITI OPPORTUNITY PROJECT ON EDUCATION (COPE)
  • Events
  • Heritage Caravan: Registration Form
  • Home
  • Schedule
Call us: +233 30 222 6013

© 2024 Citi 97.3 FM - Relevant Radio. Always

No Result
View All Result
  • Home
  • About Us
  • Schedule
  • News
    • Citi Sports
    • Citi Business
  • Citi TV
  • Audio On Demand
  • Events

© 2024 Citi 97.3 FM - Relevant Radio. Always