{"id":65176,"date":"2014-11-15T08:17:24","date_gmt":"2014-11-15T08:17:24","guid":{"rendered":"http:\/\/4cd.e16.myftpupload.com\/?p=65176"},"modified":"2014-11-15T06:52:37","modified_gmt":"2014-11-15T06:52:37","slug":"load-shedding-will-end-now-vra","status":"publish","type":"post","link":"https:\/\/citifmonline.com\/2014\/11\/load-shedding-will-end-now-vra\/","title":{"rendered":"Load shedding won’t end now – VRA"},"content":{"rendered":"
The Volta River Authority (VRA) has indicated that the flow of gas at the Gas Processing plant in Atuabo<\/strong><\/a><\/span> will not reduce or stop the load shedding completely.<\/p>\n Natural gas started flowing from the Jubilee Fields to the Atuabo Gas Processing Plant on Monday, November 10, 2014.<\/p>\n The gas is expected to help reduce the rate at which power is rationed in the country.<\/p>\n