{"id":269116,"date":"2016-11-17T06:00:04","date_gmt":"2016-11-17T06:00:04","guid":{"rendered":"http:\/\/citifmonline.com\/?p=269116"},"modified":"2016-11-17T06:00:04","modified_gmt":"2016-11-17T06:00:04","slug":"volta-disrespected-with-shoddy-eastern-corridor-road-npp","status":"publish","type":"post","link":"https:\/\/citifmonline.com\/2016\/11\/volta-disrespected-with-shoddy-eastern-corridor-road-npp\/","title":{"rendered":"Volta disrespected with ‘shoddy’ Eastern Corridor road – NPP"},"content":{"rendered":"
The opposition New Patriotic Party (NPP) in the Volta Region, went on an inspection tour on Wednesday to emphasize\u00a0its assertion that the governing National Democratic Congress (NDC), is taking its stronghold, the Volta Region, for granted.<\/p>\n
On a tour of some sections of the Eastern Corridor road network, the NPP’s Volta Regional Chairman, Peter Amewu, described the work done on as shoddy and unfair to residents of the region.<\/p>\n
<\/a><\/p>\n Citi News\u2019<\/strong> King Nobert Akpablie, was on the ground with some NPP Volta Regional executives, who highlighted the patches on the eroded portions of the road, as well as the\u00a0potholes on sections of the six month-old Asikuma-Have road, purported to have an asphaltic concrete base.<\/p>\n “This is the legacy that John Mahma and his NDC are leaving to people of the Volta Region. An asphalt road constructed less than six months, they have to go back and cut the road because it is not properly done, it is shoddy.\u201d<\/p>\n