{"id":162672,"date":"2015-10-27T11:14:30","date_gmt":"2015-10-27T11:14:30","guid":{"rendered":"http:\/\/4cd.e16.myftpupload.com\/?p=162672"},"modified":"2015-10-27T11:14:30","modified_gmt":"2015-10-27T11:14:30","slug":"dumsor-alert-ecg-sheds-430mw-tuesday","status":"publish","type":"post","link":"https:\/\/citifmonline.com\/2015\/10\/dumsor-alert-ecg-sheds-430mw-tuesday\/","title":{"rendered":"Dumsor alert: ECG sheds 430MW Tuesday"},"content":{"rendered":"
The Electricity Company of Ghana is shedding 430 megawatts of power today [Tuesday].<\/p>\n
It will span from 6am to 6pm which has been categorized as off-peak period.<\/p>\n
A statement from the ECG stated that: “Gridco has requested for 390MW\u00a0 load relief\u00a0 from ECG between 06:00hrs and 18:00hrs due to insufficient power generation.”<\/p>\n
Below is the statement:<\/strong><\/p>\n GRIDco\u00a0 OFF PEAK LOAD RELIEF REQUEST<\/strong><\/p>\n Date: 27\/10\/15<\/p>\n ____________________________<\/p>\n Gridco has requested for 430MW\u00a0 load relief\u00a0 from ECG between 06:00hrs and 18:00hrs due to insufficient power generation,the regions should therefore shed load as follows:<\/p>\n Accra…\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 150MW<\/p>\n Ashanti….\u00a0\u00a0\u00a0\u00a0\u00a0 90MW<\/p>\n Tema……..\u00a0\u00a0\u00a0\u00a0\u00a0 70MW<\/p>\n Western….\u00a0\u00a0\u00a0\u00a0\u00a0 40MW<\/p>\n Central…..\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 30MW<\/p>\n Eastern….\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 30MW<\/p>\n Volta……\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 20MW<\/p>\n Total…..\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 430MW<\/p>\n Note:<\/p>\n Group A is going 24hrs<\/p>\n Group B is coming ON<\/p>\n Group C is going OFF<\/p>\n –<\/p>\n By: citifmonline.com\/Ghana<\/p>\n","protected":false},"excerpt":{"rendered":" The Electricity Company of Ghana is shedding 430 megawatts of power today [Tuesday]. It will span from 6am to 6pm which has been categorized as off-peak period. A statement from the ECG stated that: “Gridco has requested for 390MW\u00a0 load relief\u00a0 from ECG between 06:00hrs and 18:00hrs due to insufficient power generation.” Below is the […]<\/p>\n","protected":false},"author":24,"featured_media":162673,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[17],"yoast_head":"\n