{"id":56541,"date":"2014-10-15T10:29:22","date_gmt":"2014-10-15T10:29:22","guid":{"rendered":"http:\/\/4cd.e16.myftpupload.com\/?p=56541"},"modified":"2014-10-15T10:29:22","modified_gmt":"2014-10-15T10:29:22","slug":"ecg-to-review-load-shedding-timetable","status":"publish","type":"post","link":"https:\/\/citifmonline.com\/?p=56541","title":{"rendered":"ECG to review load-shedding timetable"},"content":{"rendered":"<p>The Electricity Company of Ghana (ECG) has announced it will review its load-shedding timetable due to challenges with the generation.<\/p>\n<p>The ECG <span style=\"color: #666699;\"><a href=\"http:\/\/4cd.e16.myftpupload.com\/2014\/09\/23\/load-shedding-timetable-out\/\" target=\"_blank\"><span style=\"color: #666699;\"><strong>released a load-shedding timetable<\/strong><\/span><\/a><\/span> in September but there have been complaints from the public about inconsistencies in the power outage schedules.<\/p>\n<p>[contextly_sidebar id=&#8221;ulavKSzD87Gnsr6EhUBeMG8PD5hiAxIC&#8221;]The Public Relations Officer (PRO) of ECG\u00a0 told <b>Citi News<\/b> admitted that the company was struggling to stick to the load-shedding schedule \u00a0and will consider revising the timetable.<\/p>\n<p>\u201cWe are having challenges with the deficit \u00a0we used in drawing the timetable, anytime we exceed the quantum, customers that are not supposed to be off are put off.\u201d<\/p>\n<p>\u201d In the last week we\u2019ve had serious problems with frequency. We are in consultation with the generation and transmission companies who will give us a better understanding of the situation and then we\u2019ll see whether there is a need for us to revise the timetable.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>By: Edwin Kwakofi\/citifmonline.com\/Ghana<\/p>\n<p><b>\u00a0<\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Electricity Company of Ghana (ECG) has announced it will review its load-shedding timetable due to challenges with the generation. The ECG released a load-shedding timetable in September but there have been complaints from the public about inconsistencies in the power outage schedules. [contextly_sidebar id=&#8221;ulavKSzD87Gnsr6EhUBeMG8PD5hiAxIC&#8221;]The Public Relations Officer (PRO) of ECG\u00a0 told Citi News admitted [&hellip;]<\/p>\n","protected":false},"author":20,"featured_media":50216,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"jnews_social_meta":[],"jnews_override_counter":[],"footnotes":""},"categories":[2],"tags":[38],"class_list":["post-56541","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-education","tag-palaver-newspaper"],"_links":{"self":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/posts\/56541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=56541"}],"version-history":[{"count":0,"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/posts\/56541\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/media\/50216"}],"wp:attachment":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=56541"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=56541"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=56541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}