{"id":397071,"date":"2018-02-01T06:24:01","date_gmt":"2018-02-01T06:24:01","guid":{"rendered":"http:\/\/citifmonline.com\/?p=397071"},"modified":"2018-02-01T07:08:53","modified_gmt":"2018-02-01T07:08:53","slug":"nungua-completed-teshie-chps-compound-abandoned-new-one-constructed-nearby","status":"publish","type":"post","link":"https:\/\/citifmonline.com\/?p=397071","title":{"rendered":"Nungua: Completed Teshie CHPS compound abandoned; new one constructed nearby"},"content":{"rendered":"<p>The Ledzokuku Krowor Municipal Assembly has begun construction of a new CHPS compound at Nungua after abandoning a completed one nearby at Teshie Camp 2 non-operational for more than 12 months.<\/p>\n<p>The Teshie camp 2 facility was completed in 2016, however, it has not been put to use by the Assembly, leaving residents with no option than to seek medical attention at alternative facilities.<\/p>\n<p><strong>Citi News<\/strong> gatherered that the facility, worth GH\u00a2320,000, had been abandoned due to delay in the procurement of medical equipment for the use of health professionals.<\/p>\n<p>Although budget had been drawn for the procurement of the equipment some six months ago, funds seem not to have been raised to purchase them.<\/p>\n<p>However, the Assembly found funds from other sources to construct the new facility which is almost complete.<\/p>\n<figure id=\"attachment_397076\" aria-describedby=\"caption-attachment-397076\" style=\"width: 1032px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-397076\" src=\"http:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/Teshie-Camp-2-CHPS.jpeg\" alt=\"\" width=\"1032\" height=\"774\" srcset=\"https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/Teshie-Camp-2-CHPS.jpeg 1032w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/Teshie-Camp-2-CHPS-300x225.jpeg 300w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/Teshie-Camp-2-CHPS-768x576.jpeg 768w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/Teshie-Camp-2-CHPS-1024x768.jpeg 1024w\" sizes=\"auto, (max-width: 1032px) 100vw, 1032px\" \/><figcaption id=\"caption-attachment-397076\" class=\"wp-caption-text\">Abandoned Teshie Camp 2 CHPS<\/figcaption><\/figure>\n<p><strong>See photos of the new facility below:<\/strong><\/p>\n<figure id=\"attachment_397074\" aria-describedby=\"caption-attachment-397074\" style=\"width: 1032px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-397074\" src=\"http:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-2.jpeg\" alt=\"\" width=\"1032\" height=\"774\" srcset=\"https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-2.jpeg 1032w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-2-300x225.jpeg 300w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-2-768x576.jpeg 768w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-2-1024x768.jpeg 1024w\" sizes=\"auto, (max-width: 1032px) 100vw, 1032px\" \/><figcaption id=\"caption-attachment-397074\" class=\"wp-caption-text\">New Nungua CHPS compound<\/figcaption><\/figure>\n<figure id=\"attachment_397073\" aria-describedby=\"caption-attachment-397073\" style=\"width: 1032px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-397073\" src=\"http:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-1.jpeg\" alt=\"\" width=\"1032\" height=\"774\" srcset=\"https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-1.jpeg 1032w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-1-300x225.jpeg 300w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-1-768x576.jpeg 768w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-1-1024x768.jpeg 1024w\" sizes=\"auto, (max-width: 1032px) 100vw, 1032px\" \/><figcaption id=\"caption-attachment-397073\" class=\"wp-caption-text\">New Nungua CHPS compound<\/figcaption><\/figure>\n<figure id=\"attachment_397072\" aria-describedby=\"caption-attachment-397072\" style=\"width: 1032px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-397072\" src=\"http:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-3.jpeg\" alt=\"\" width=\"1032\" height=\"774\" srcset=\"https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-3.jpeg 1032w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-3-300x225.jpeg 300w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-3-768x576.jpeg 768w, https:\/\/citifmonline.com\/wp-content\/uploads\/2018\/02\/New-Nungua-CHPS-compound-3-1024x768.jpeg 1024w\" sizes=\"auto, (max-width: 1032px) 100vw, 1032px\" \/><figcaption id=\"caption-attachment-397072\" class=\"wp-caption-text\">New Nungua CHPS compound<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>&#8211;<\/p>\n<p>By: Anas Seidu\/citifmonline.com\/Ghana<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ledzokuku Krowor Municipal Assembly has begun construction of a new CHPS compound at Nungua after abandoning a completed one nearby at Teshie Camp 2 non-operational for more than 12 months. The Teshie camp 2 facility was completed in 2016, however, it has not been put to use by the Assembly, leaving residents with no [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":397074,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"jnews_social_meta":[],"jnews_override_counter":[],"footnotes":""},"categories":[19,11],"tags":[3751,360,3],"class_list":["post-397071","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-health","category-top-stories","tag-chps-compound","tag-ghana-health-service","tag-ghana-news"],"_links":{"self":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/posts\/397071","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=397071"}],"version-history":[{"count":0,"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/posts\/397071\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/media\/397074"}],"wp:attachment":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=397071"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=397071"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=397071"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}