{"id":137032,"date":"2015-07-23T16:50:27","date_gmt":"2015-07-23T16:50:27","guid":{"rendered":"http:\/\/4cd.e16.myftpupload.com\/?p=137032"},"modified":"2015-07-23T20:10:18","modified_gmt":"2015-07-23T20:10:18","slug":"more-dumsor-akosombo-dam-to-shut-down-3-more-turbines","status":"publish","type":"post","link":"https:\/\/citifmonline.com\/?p=137032","title":{"rendered":"More Dumsor: Akosombo dam to shut down 3 more turbines"},"content":{"rendered":"<p>The engineering department at the Akosombo Dam has hinted to <strong>Citi Business News,\u00a0<\/strong>it has put in a request for the shut down of three turbines of the dam.<\/p>\n<p><a href=\"http:\/\/4cd.e16.myftpupload.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-137035\" src=\"http:\/\/4cd.e16.myftpupload.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-2.jpg\" alt=\"akosombo dam (2)\" width=\"600\" height=\"338\" srcset=\"https:\/\/citifmonline.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-2.jpg 586w, https:\/\/citifmonline.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-2-300x169.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p>This follows the consistent drop in the water levels in the dam.<\/p>\n<p><a href=\"http:\/\/4cd.e16.myftpupload.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-4.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-137038 aligncenter\" src=\"http:\/\/4cd.e16.myftpupload.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-4.jpg\" alt=\"akosombo dam (4)\" width=\"768\" height=\"432\" srcset=\"https:\/\/citifmonline.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-4.jpg 768w, https:\/\/citifmonline.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-4-300x169.jpg 300w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/p>\n<p>According to the dam&#8217;s manager of electricals, Ebo Amoah, the chief executive of the facility is waiting for authorisation from government to shut down the turbines.<\/p>\n<p><a href=\"http:\/\/4cd.e16.myftpupload.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-137036 aligncenter\" src=\"http:\/\/4cd.e16.myftpupload.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-3.jpg\" alt=\"akosombo dam (3)\" width=\"768\" height=\"432\" srcset=\"https:\/\/citifmonline.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-3.jpg 768w, https:\/\/citifmonline.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-3-300x169.jpg 300w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/p>\n<p>The dam is currently running on 5 out of the 6 turbines and is producing 636 megawatts of electricity.<\/p>\n<p><a href=\"http:\/\/4cd.e16.myftpupload.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-137034\" src=\"http:\/\/4cd.e16.myftpupload.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-1.jpg\" alt=\"akosombo dam (1)\" width=\"768\" height=\"432\" srcset=\"https:\/\/citifmonline.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-1.jpg 768w, https:\/\/citifmonline.com\/wp-content\/uploads\/2015\/07\/akosombo-dam-1-300x169.jpg 300w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/p>\n<p>There are fears the facility will break down if these emergency decisions are not taken.<\/p>\n<p>Speaking in an interview with <strong>Citi Business News<\/strong>,\u00a0Ebo Amoah said the situation has getting worse due to lack of rain in the northern part of the country.<\/p>\n<p>\u201cThe water level is dropping because it\u2019s not raining in the north. It means when the levels go down, you cannot run all the machines at a certain point. We are looking at 240ft as the minimum level so at 240ft you need to take certain decisions, bringing some of the machines down.\u201d<\/p>\n<p>\u201cWe are not rising, we are dropping but very slowly. Once it\u2019s dropping, we are likely to reduce power generation. Every year when the water level is going low, we shut down some generators. We\u2019ve delayed in bringing the generators down. This is because one needs authorization to do that so the powers that be should give that command so we go ahead and shut it down,\u201d he added.<\/p>\n<p>President John Mahama during a visit\u00a0to\u00a0the facility in February 2015 directed the Power Ministry to as a matter of urgency fast track the procurement of power barges \u00a0to complement Ghana\u2019s power sector as the Akosombo contemplates <span style=\"color: #666699;\"><strong><a style=\"color: #666699;\" href=\"http:\/\/4cd.e16.myftpupload.com\/2015\/02\/05\/akosombo-to-shut-down-another-unit-if\/\" target=\"_blank\">shutting down one of its turbines<\/a><\/strong><\/span>.<\/p>\n<p>He explained that the government has been forced take such decision because of the falling water levels in the dam adding that \u201cIt is obvious that the lake level is low as a result of two years of less than average rainfall. It means that we are just 5 feet above the minimum operating level and so Akosombo is only running only four units.\u201d<\/p>\n<p><strong>Click below to watch video of\u00a0the current state of the Akosombo dam:<\/strong><br \/>\n<iframe loading=\"lazy\" src=\"https:\/\/www.youtube.com\/embed\/Eg0JERrC3JA\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><br \/>\n&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&#8211;<\/p>\n<p>By: Rabiu Alhassan\/citifmonline.com\/Ghana<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The engineering department at the Akosombo Dam has hinted to Citi Business News,\u00a0it has put in a request for the shut down of three turbines of the dam. This follows the consistent drop in the water levels in the dam. According to the dam&#8217;s manager of electricals, Ebo Amoah, the chief executive of the facility [&hellip;]<\/p>\n","protected":false},"author":24,"featured_media":137035,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"jnews_social_meta":[],"jnews_override_counter":[],"footnotes":""},"categories":[],"tags":[43,38,21,4],"class_list":["post-137032","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","tag-foresight-medical-center","tag-palaver-newspaper","tag-psychiatric","tag-st-augustines-college"],"_links":{"self":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/posts\/137032","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=137032"}],"version-history":[{"count":0,"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/posts\/137032\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=\/wp\/v2\/media\/137035"}],"wp:attachment":[{"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=137032"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=137032"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/citifmonline.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=137032"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}